FEATURED PROJECT #1 garage/shop
This project is located in Calistoga California. It features a 4 car garage/shop on a 30' X 50' concrete slab. The S.I.P.'s that were used in this project are 4' X 8'X 4-1/2" insulated walls and 4' X 18'X 8-1/2" insulated roof panels.
Total time to frame:
6 days for complete walls and roof.
5 days for siding, trim and skylight additions.
This Craftsman style covered walk is on the same property as the SIP project above.